[vc_single_image image=”2152″ img_size=”large” qode_css_animation=””][vc_empty_space height=”50px”]
Work started at Portsmouth Naval Docks, 2-8 The Parade and walkway groundworks. The historical Grade II parade inside HMS Naval docks required drainage repairs.
The Terrace of dockyard officers’ lodgings, 1715-19. Partially converted to office use c1995, but now empty. Prone to wet rot and some structural movement. Structural and drainage problems persist between the main building and the rear extensions. Pavenet secured the contract to assist with the drainage renovations to these illustrious buildings.
